Thursday, June 2, 2011

rain rain go away

Well I can't remember the last time we didn't get some rain during a week. and boy has it made things tough, with the sediment from the floods just under the leaf surface it doesn't take much to make things slippery.

The Irrigation installation is virtually complete, with testing and leveling still ongoing, the trenches have had sand and seed mix put into them and we still have many to do, along with re topping up where they have sunk this will be ongoing to spring but we are making progress .

The irrigation pump station is up and running , with the last pump in and getting repaired at this time so all four pumps are in as new condition.

There is only the upgrade to the old system to be done and we can then connect it up to the TORO site pro controller thus giving us more efficient watering and saving allot of hours from moving hoses.

The Verti-drain machine has been out when conditions allow us to use it and time available so far we have done the 7th, 8th, 9th, 13th, 15th, 17th,18th, the 15th has had its bare patches verti-drained and sanded and seeded and is coming back well, this week we ran the vert-drain through the water holding hollows on the 13th to help them drain.

We plan for next week to get into a few more bunkers and expose the drain and flush the sediment out so they can work( this is only a temporary fix) as we did on the left hand side of the 4th a few weeks ago we hope to get the 1st 13th and 4th right hand side done.

Well thats about it for today till next time keep swinging pete